
COMPLETED PROJECT
Complete renovation and conversion into nine student apartments.
The building was fully renovated and converted to create nine separate student apartments. All engineering networks and technical systems were replaced, including electrical and low-voltage systems, water supply, drainage, ventilation and heating. The project also included technical equipment, partial façade renovation and construction of a new dormer extension.

























PLANNING A PROJECT?
SOLIDEX / PRIVACY
SOLIDEX BOUW B.V. uses one necessary cookie to remember your choice. With your permission, Google — the only third party used for these optional services — may process device, connection and usage data for Maps, analytics and campaign measurement. Accept, reject or choose each purpose now; withdraw later through Cookie settings. Read the Cookie Policy
Stores your choices for up to 180 days and supports essential site operation.