
COMPLETED PROJECT
Complete renovation and conversion into nine student apartments.
The building is being fully renovated and converted to create nine separate student apartments. Electrical and low-voltage systems, water supply, drainage, ventilation and heating are being replaced, with the necessary technical equipment installed. The project also includes partial renovation of the façade.









PLANNING A PROJECT?
SOLIDEX / PRIVACY
SOLIDEX BOUW B.V. uses one necessary cookie to remember your choice. With your permission, Google — the only third party used for these optional services — may process device, connection and usage data for Maps, analytics and campaign measurement. Accept, reject or choose each purpose now; withdraw later through Cookie settings. Read the Cookie Policy
Stores your choices for up to 180 days and supports essential site operation.